Licensed CA C-39 #000000 · Insured & Bonded Mon–Fri 7am–6pm · Sat 8am–2pm Serving the West San Fernando Valley (818) 555-0132 Text us
Asphalt shingle

Roof replacement.

A full tear-off to the deck, so nothing is hidden under the new roof. You see the plywood before anything goes back on.

$11,000 – $19,000Typical 1,800–2,400 sq ft home, full tear-off.
Roof replacement in the West San Fernando Valley

Our process

How it goes,
start to finish.

01

Free inspection

Inside 48 hours. Photos of every problem on your phone before we leave.
02

Fixed written price

One number for the whole scope. It does not move on the day.
03

Tear-off and deck check

The old roof comes off and you see the deck yourself.
04

New roof and walkthrough

You walk the finished roof with the foreman before we invoice.
One we did

A job file, not a case study.

Where
Tarzana, off Wells Dr
Roof
2,180 sq ft asphalt, 23 years old
Why they called
Two brown rings on a bedroom ceiling after the first rain.
What we found
No single leak. The shingles had lost their granules on the south slope and the felt underneath had gone brittle end to end. Three previous patches, all sealant, all failed.
What we did
Full tear-off. Eleven sheets of decking replaced along the south eave where it had stayed damp. Synthetic underlayment, new valley and wall metal, ridge vent added — the attic had intake and no exhaust.

Decking was the only change to the quote. Eleven sheets, priced per sheet, photographed before they went on.

What is actually included

Every one of these is in the written price. None of it is an extra.

01

Full tear-off

Every layer comes off. We do not shingle over an old roof, because it hides rot and voids the manufacturer warranty.

02

Deck inspection with you

You walk the bare deck with the foreman. Any soft plywood is photographed, priced and replaced before we go on.

03

Synthetic underlayment

Not felt. It stays watertight if weather arrives mid-job and it does not tear underfoot.

04

New flashing throughout

Valleys, walls, chimneys and pipe boots are replaced, not re-used. Old flashing is where most leaks start.

05

Ridge ventilation

Balanced intake and exhaust, so the attic runs cooler and the shingles last their rated life.

06

Site left clean

Magnetic sweep of the drive and lawn, dumpster gone the day we finish.

Before you call

Three to five working days for a typical Valley home. Tile runs longer. We dry-in the same day we tear off, so the house is never open overnight.

We will not. It is legal in some cases and it is cheaper, but it hides rotten decking, adds weight the framing was not designed for, and most manufacturers will not warranty it.

We stop and show you. Decking is priced per sheet, agreed before it goes on, and photographed. It is the only thing that can change the number.

No. It is loud and there is a dumpster in the drive, but the house stays liveable and we never leave it open to weather.

Get a quote

Free, within 48 hours.

  • Answered by a person, not a machine
  • Inspection within 48 hours — same day for a leak
  • Free 36-month financing on a roof replacement
  • Serving 18 West Valley neighbourhoods

Free, no obligation. We call you back the same day — no spam, no list.

Call (818) 555-0132 Text